Total absolute deviation of job completion times on uniform and unrelated machines

פרסום מחקרי: פרסום בכתב עתמאמרביקורת עמיתים

15 ציטוטים ‏(Scopus)

תקציר

Unlike other measures of variation of job completion times considered in scheduling literature, the measure of minimizing total absolute deviation of job completion times (TADC) was shown to have a polynomial time solution on a single machine. It was recently shown to remain polynomially solvable when position-dependent job processing times are assumed. In this paper we further extend these results, and show that minimizing TADC remains polynomial when position-dependent processing times are assumed (i) on uniform and unrelated machines and (ii) for a bicriteria objective consisting of a linear combination of total job completion times and TADC. These extensions are shown to be valid also for the measure of total absolute differences of job waiting times (TADW).

שפה מקוריתאנגלית
עמודים (מ-עד)660-665
מספר עמודים6
כתב עתComputers and Operations Research
כרך38
מספר גיליון3
מזהי עצם דיגיטלי (DOIs)
סטטוס פרסוםפורסם - מרץ 2011
פורסם באופן חיצוניכן

טביעת אצבע

להלן מוצגים תחומי המחקר של הפרסום 'Total absolute deviation of job completion times on uniform and unrelated machines'. יחד הם יוצרים טביעת אצבע ייחודית.