תקציר
We study a scheduling problem to minimise total late work, i.e. each job is penalised according to the duration of its parts scheduled after its due-date. The machine setting is an m-machine proportionate flow shop. Two versions of the problem are studied: (i) the case that total late work refers to the last operation of the job (i.e. the operation performed on the last machine of the flow shop); (ii) the case that total late work refers to all the operations (on all machines). Both versions are known to be NP-hard. We prove a crucial property of an optimal schedule, and consequently introduce efficient pseudo-polynomial dynamic programming algorithms for the two versions. The dynamic programming algorithms are tested numerically and proved to perform well on large size instances.
| שפה מקורית | אנגלית |
|---|---|
| עמודים (מ-עד) | 531-543 |
| מספר עמודים | 13 |
| כתב עת | International Journal of Production Research |
| כרך | 57 |
| מספר גיליון | 2 |
| מזהי עצם דיגיטלי (DOIs) | |
| סטטוס פרסום | פורסם - 17 ינו׳ 2019 |
טביעת אצבע
להלן מוצגים תחומי המחקר של הפרסום 'Scheduling on a proportionate flowshop to minimise total late work'. יחד הם יוצרים טביעת אצבע ייחודית.פורמט ציטוט ביבליוגרפי
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver