תקציר
Several papers published during the last decade dealt with scheduling a maintenance activity and considered a new setting, where the maintenance duration is assumed to be deteriorating, i.e., it requires more time or effort if it is delayed. We study a deteriorating maintenance in the context of due-window assignment, where a time interval is determined such that jobs completed within this interval are "on-time", whereas early and tardy jobs are penalized. Thus, our paper extends known models by considering simultaneously a deteriorating maintenance and due-window. Two deterioration types are considered: time-dependent (where the maintenance time increases as a function of its starting time), and position-dependent (where it is a function of its position in the sequence). The classical assumption of position-independent processing times was considered first, and then the model is extended to general position-dependent processing times. We prove several properties of the optimal timing of the due-window and of the maintenance. Consequently, we show that all the problems studied here are solved in O(n4), where n is the number of jobs.
| שפה מקורית | אנגלית |
|---|---|
| עמודים (מ-עד) | 33-40 |
| מספר עמודים | 8 |
| כתב עת | Computers and Operations Research |
| כרך | 57 |
| מזהי עצם דיגיטלי (DOIs) | |
| סטטוס פרסום | פורסם - מאי 2015 |
טביעת אצבע
להלן מוצגים תחומי המחקר של הפרסום 'Scheduling a deteriorating maintenance activity and due-window assignment'. יחד הם יוצרים טביעת אצבע ייחודית.פורמט ציטוט ביבליוגרפי
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver