Minmax scheduling problems with common flow-allowance

B. Mor, G. Mosheiov

פרסום מחקרי: פרסום בכתב עתמאמרביקורת עמיתים

15 ציטוטים ‏(Scopus)

תקציר

In due-date assignment problems with a common flow-allowance, the due-date of a given job is defined as the sum of its processing time and a job-independent constant. We study flow-allowance on a single machine, with an objective function of a minmax type. The total cost of a given job consists of its earliness/tardiness and its flow-allowance cost components. Thus, we seek the job schedule and flow-allowance value that minimize the largest cost among all the jobs. Three extensions are considered: the case of general position-dependent processing times, the model containing an explicit cost for the due-dates, and the setting of due-windows. Properties of optimal schedules are fully analysed in all cases, and all the problems are shown to have polynomial time solutions.

שפה מקוריתאנגלית
עמודים (מ-עד)1284-1293
מספר עמודים10
כתב עתJournal of the Operational Research Society
כרך63
מספר גיליון9
מזהי עצם דיגיטלי (DOIs)
סטטוס פרסוםפורסם - ספט׳ 2012
פורסם באופן חיצוניכן

טביעת אצבע

להלן מוצגים תחומי המחקר של הפרסום 'Minmax scheduling problems with common flow-allowance'. יחד הם יוצרים טביעת אצבע ייחודית.

פורמט ציטוט ביבליוגרפי