Abstract
Several projects under random disturbances have to be realized in a project office within the planning horizon. The office comprises a number of different divisions, each of which carries out a certain stage of a project. Each project has its individual technological route and the chance contrraint to meet the due date on time. The problem is to determine starting time moments for each project to be passed on each division.
Original language | English |
---|---|
Pages (from-to) | 278-282 |
Number of pages | 5 |
Journal | Technological and Economic Development of Economy |
Volume | 11 |
Issue number | 4 |
DOIs | |
State | Published - 2005 |
Keywords
- Design office
- Project
- Scheduling