Skip to main navigation Skip to search Skip to main content

Minimizing maximum late work with optional job rejection on a single machine

Research output: Contribution to journalArticlepeer-review

Abstract

In this paper, we study the problem of minimizing the maximum late work with the popular option of job rejection on a single machine. We provide two fundamental properties regarding an optimal schedule, prove that the problem is NP-hard, and suggest pseudo-polynomial dynamic programming (DP), establishing that the problem is ordinary NP-hard. We also provide an extensive numerical study. Next, we leverage the provided DP to introduce an algorithm that maps the Pareto-optimal frontier.

Original languageEnglish
JournalJournal of Scheduling
DOIs
StateAccepted/In press - 2026

Keywords

  • Job rejection
  • Maximum late work
  • Scheduling
  • Single machine

Fingerprint

Dive into the research topics of 'Minimizing maximum late work with optional job rejection on a single machine'. Together they form a unique fingerprint.

Cite this