Construction projects are inherently ad-hoc, meaning if disruptions arise, it can be hard to quantify the impact of the “damage” that has been done to the cost or timeline as a result of the disruption, as there isn’t necessarily a nominal steady-state condition to compare it to. In this paper, we present a case study of an infrastructure construction project that was beset by over a hundred documented disruptions due to a politically charged project that had ongoing, active attempts to interfere. Traditional approaches to quantifying the impact of disruptions presume there is a baseline against which the disruptions can be compared, which is not the case in a unstable project. Also, they are inherently “transformation” in their approach, whereas a Lean Construction approach would recognize the importance of taking a more holistic view incorporating elements of Flow and Value. A WIP-based metric of the project outcome, called “WIP-Time” is proposed and assessed in the context of the case study.
| اللغة الأصلية | الإنجليزيّة |
|---|---|
| الصفحات (من إلى) | 344-352 |
| عدد الصفحات | 9 |
| دورية | Annual Conference of the International Group for Lean Construction, IGLC |
| مستوى الصوت | 31 |
| المعرِّفات الرقمية للأشياء | |
| حالة النشر | نُشِر - 2023 |
| الحدث | 31st Annual Conference of the International Group for Lean Construction, IGLC 2023 - Lille, فرنسا المدة: 26 يونيو 2023 → 2 يوليو 2023 |
بصمة
أدرس بدقة موضوعات البحث “TOWARDS A FLOW-BASED DISRUPTION METRIC: A CASE STUDY'. فهما يشكلان معًا بصمة فريدة.قم بذكر هذا
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver