تخطي إلى التنقل الرئيسي تخطي إلى البحث تخطي إلى المحتوى الرئيسي

Study and development of CW room temperature rebuncher for SARAF accelerator

  • B. Kaizer
  • , J. Rodnizki
  • , E. Farber
  • , A. Perry
  • , L. Danon
  • , Z. Horvitz
  • , O. Mazor
  • , A. Friedman
  • , M. Di Giacomo
  • , J. F. Leyge
  • , M. Michel
  • , P. Toussaint

نتاج البحث: نشر في مجلةمقالةمراجعة النظراء

4 اقتباسات (Scopus)

ملخص

The SARAF 176 MHz accelerator is designed to provide CW proton/deuteron beams up to 5 mA current and 40 MeV accelerated ion energy. Phase I of SARAF (up to 4–5 MeV) has been installed, commissioned, and is available for experimental work. Phase II of SARAF is currently in the design and first prototyping stage and will contain longer MEBT with three rebunchers and four cryomodules, each consisting of SC HWRs and solenoids. Phase II MEBT line is designed to follow a 1.3 MeV/u RFQ, is 4.5 m long, and contains three 176 MHz rebunchers providing a field integral of 105 kV. Different rebuncher configurations have been studied in order to minimize the RF losses and maximize the shunt impedance. Different apertures have also been tested with the 40 mm diameter required by beam dynamics. The simulations were done using CST Microwave Studio. CEA leads the design for SARAF phase II linac including the MEBT rebunchers and has studied a mixed solid copper and Cu plated stainless steel, 3-gap cavity. SNRC is developing a 4-gap OFHC copper rebuncher as a risk reduction. Both designs are presented and discussed in the paper.

اللغة الأصليةالإنجليزيّة
الصفحات (من إلى)161-168
عدد الصفحات8
دوريةNuclear Instruments and Methods in Physics Research, Section A: Accelerators, Spectrometers, Detectors and Associated Equipment
مستوى الصوت871
المعرِّفات الرقمية للأشياء
حالة النشرنُشِر - 1 نوفمبر 2017

بصمة

أدرس بدقة موضوعات البحث “Study and development of CW room temperature rebuncher for SARAF accelerator'. فهما يشكلان معًا بصمة فريدة.

قم بذكر هذا