تخطي إلى التنقل الرئيسي تخطي إلى البحث تخطي إلى المحتوى الرئيسي

Scheduling problems with two competing agents to minimize minmax and minsum earliness measures

نتاج البحث: نشر في مجلة › مقالة › مراجعة النظراء

80 اقتباسات (Scopus)

ملخص

A relatively new class of scheduling problems consists of multiple agents who compete on the use of a common processor. We focus in this paper on a two-agent setting. Each of the agents has a set of jobs to be processed on the same processor, and each of the agents wants to minimize a measure which depends on the completion times of its own jobs. The goal is to schedule the jobs such that the combined schedule performs well with respect to the measures of both agents. We consider measures of minmax and minsum earliness. Specifically, we focus on minimizing maximum earliness cost or total (weighted) earliness cost of one agent, subject to an upper bound on the maximum earliness cost of the other agent. We introduce a polynomial-time solution for the minmax problem, and prove NP-hardness for the weighted minsum case. The unweighted minsum problem is shown to have a polynomial-time solution.

اللغة الأصليةالإنجليزيّة
الصفحات (من إلى)540-546
عدد الصفحات7
دوريةEuropean Journal of Operational Research
مستوى الصوت206
رقم الإصدار3
المعرِّفات الرقمية للأشياء
حالة النشرنُشِر - 1 نوفمبر 2010
منشور خارجيًانعم

بصمة

أدرس بدقة موضوعات البحث “Scheduling problems with two competing agents to minimize minmax and minsum earliness measures'. فهما يشكلان معًا بصمة فريدة.

قم بذكر هذا