ملخص
The classical flexible flowshop ((Formula presented.)) environment consists of (Formula presented.) -stages in series with (Formula presented.) -machines in parallel at each stage, where each job has to undergo a particular series of actions. In this paper we consider a similar, yet different, and still a challenging real-life setting, that, to the best of our knowledge, has not been studied to date. We assume that there are (Formula presented.) -sets in parallel in which each of the sets is an (Formula presented.) -machine proportionate flowshop. In this new setting, each job can be processed on each one of the sets, but once a set is chosen, the job must be processed on all of its machines, in first-in-first-out method. We study several fundamental scheduling measures such as makespan, maximum tardiness with common due-date, total tardiness with common due-date, and total load. Moreover, we consider optional job-rejection and focus on minimising the total completion time. All problems are shown to be NP-hard, and pseudo-polynomial dynamic programming (DP) solution algorithms and Simulated Annealing (SA) metaheuristics are provided. The efficiency of all our proposed algorithms is validated through an extensive numerical study.
| اللغة الأصلية | الإنجليزيّة |
|---|---|
| الصفحات (من إلى) | 1499-1516 |
| عدد الصفحات | 18 |
| دورية | Journal of the Operational Research Society |
| مستوى الصوت | 73 |
| رقم الإصدار | 7 |
| المعرِّفات الرقمية للأشياء | |
| حالة النشر | نُشِر - 14 يوليو 2022 |
بصمة
أدرس بدقة موضوعات البحث “Scheduling problems on a new setting of flexible flowshops: ℓ-Machine proportionate flowshops'. فهما يشكلان معًا بصمة فريدة.قم بذكر هذا
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver