تخطي إلى التنقل الرئيسي تخطي إلى البحث تخطي إلى المحتوى الرئيسي

Polynomial time solutions for scheduling problems on a proportionate flowshop with two competing agents

نتاج البحث: نشر في مجلة › مقالة › مراجعة النظراء

36 اقتباسات (Scopus)

ملخص

In scheduling problems with two competing agents, each one of the agents has his own set of jobs and his own objective function, but both share the same processor. The goal is to minimize the value of the objective function of one agent, subject to an upper bound on the value of the objective function of the second agent. In this paper we study two-agent scheduling problems on a proportionate flowshop. Three objective functions of the first agent are considered: minimum maximum cost of all the jobs, minimum total completion time, and minimum number of tardy jobs. For the second agent, an upper bound on the maximum allowable cost is assumed. We introduce efficient polynomial time solution algorithms for all cases.

اللغة الأصليةالإنجليزيّة
الصفحات (من إلى)151-157
عدد الصفحات7
دوريةJournal of the Operational Research Society
مستوى الصوت65
رقم الإصدار1
المعرِّفات الرقمية للأشياء
حالة النشرنُشِر - يناير 2014

بصمة

أدرس بدقة موضوعات البحث “Polynomial time solutions for scheduling problems on a proportionate flowshop with two competing agents'. فهما يشكلان معًا بصمة فريدة.

قم بذكر هذا