Notice of Retraction: Cost estimating the quality of stochastic network projects' portfolio

نتاج البحث: فصل من :كتاب / تقرير / مؤتمرفصلمراجعة النظراء

ملخص

A highly complicated project management system in R&D design offices including several simultaneously realized PERT-COST type network projects, is considered. The projects are of different importance and significance; for each project its corresponding priority index is pregiven. The total budget at the project management disposal to carry out all the projects, is limited. Given for each project its priority value, the problem is to determine optimal budget assignments and optimal due dates of accomplishing each project, to maximize the weighted sum of the projects' utilities. Thus, the problem centers on maximizing the system's utility by implementing the harmonization model for each single project, which has been outlined in [1]. The problem's solution is based on redistributing the pregiven total project's portfolio budget among the projects in order to maximize the summarized quality of the portfolio.

اللغة الأصليةالإنجليزيّة
عنوان منشور المضيفICAMS 2010 - Proceedings of 2010 IEEE International Conference on Advanced Management Science
ناشرIEEE Computer Society
الصفحات313-316
عدد الصفحات4
رقم المعيار الدولي للكتب (المطبوع)9781424469291
المعرِّفات الرقمية للأشياء
حالة النشرنُشِر - 2010

سلسلة المنشورات

الاسمICAMS 2010 - Proceedings of 2010 IEEE International Conference on Advanced Management Science
مستوى الصوت3

بصمة

أدرس بدقة موضوعات البحث “Notice of Retraction: Cost estimating the quality of stochastic network projects' portfolio'. فهما يشكلان معًا بصمة فريدة.

قم بذكر هذا