We study single machine scheduling problems with the following features: (i) Generalized due-dates are considered, i.e., the j-th due-date is assigned to the j-th completed job; (ii) A fixed maintenance activity during which no production is feasible is assumed; (iii) The objective functions are minimizing various tardiness measures. Specifically, four objective functions are considered: total tardiness, maximum tardiness, the number of tardy jobs and total late work. We introduce pseudo-polynomial solution algorithms for these NP-hard problems. Our numerical tests indicate that instances of medium size of all four problems are solved in very reasonable running times.
| اللغة الأصلية | الإنجليزيّة |
|---|---|
| رقم المقال | 106133 |
| دورية | Computers and Operations Research |
| مستوى الصوت | 152 |
| المعرِّفات الرقمية للأشياء | |
| حالة النشر | نُشِر - أبريل 2023 |
بصمة
أدرس بدقة موضوعات البحث “Minimizing tardiness scheduling measures with generalized due-dates and a maintenance activity'. فهما يشكلان معًا بصمة فريدة.قم بذكر هذا
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver