تخطي إلى التنقل الرئيسي تخطي إلى البحث تخطي إلى المحتوى الرئيسي

A probabilistic approach to the Stochastic Job-Shop Scheduling problem

نتاج البحث: نشر في مجلةمقالة من مؤنمرمراجعة النظراء

16 اقتباسات (Scopus)

ملخص

Uncertainty exists in almost any manufacturing process, and its effect may be detrimental to the manufacturing outcomes. In the Stochastic Job Shop Scheduling Problem (SJSSP), some of the process parameters are random variables, in particular the processing time. This paper considers another facet of the SJSSP, which is the probability for success (or failure) of a manufacturing job and its effect on other jobs. The paper presents a mathematical model for determining the expected manufacturing cost, and proposes heuristics for reducing that cost. The fundamental model is based on a single resource (e.g. a single machine) and a set of manufacturing jobs, each characterized by a cost and a probabilistic distribution for success. A failure causes either a re-work of the failed job, or restarting the entire process from the first job. Since the problem is NH Hard, a set of heuristics for scheduling the jobs is proposed, and simulation results validate these heuristics.

اللغة الأصليةالإنجليزيّة
الصفحات (من إلى)533-540
عدد الصفحات8
دوريةProcedia Manufacturing
مستوى الصوت21
المعرِّفات الرقمية للأشياء
حالة النشرنُشِر - 2018
الحدث15th Global Conference on Sustainable Manufacturing, GCSM 2017 - Haifa, إسرائيل
المدة: 25 سبتمبر 201727 سبتمبر 2017

بصمة

أدرس بدقة موضوعات البحث “A probabilistic approach to the Stochastic Job-Shop Scheduling problem'. فهما يشكلان معًا بصمة فريدة.

قم بذكر هذا