ملخص
Most classical scheduling objective functions have been studied in the context of a proportionate flowshop. In most cases, the solution was shown to be identical to that of the single machine version. In this note we introduce a rare case where the extension to a proportionate flowshop leads to a different solution. Specifically, we study the problem of minimizing maximum earliness. We show that the problem remains polynomially solvable, but the running time of our proposed greedy-type algorithm is larger than that of the single machine case.
| اللغة الأصلية | الإنجليزيّة |
|---|---|
| الصفحات (من إلى) | 253-255 |
| عدد الصفحات | 3 |
| دورية | Information Processing Letters |
| مستوى الصوت | 115 |
| رقم الإصدار | 2 |
| المعرِّفات الرقمية للأشياء | |
| حالة النشر | نُشِر - فبراير 2015 |
بصمة
أدرس بدقة موضوعات البحث “A note: Minimizing maximum earliness on a proportionate flowshop'. فهما يشكلان معًا بصمة فريدة.قم بذكر هذا
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver